驻马店翻译公司关键字:Link project has been irretrievably lost, and now the only hope, is what has been achieved not lost. This project did not achieve value for money, tuition fees have been spent to obtain the skills and achievements, should be able to play a role in other projects. To absorb these things, extended to the whole 标书制作行业industry, and even extended to other industrial sectors, is it not the entire 标书制作行业industry can enhance the management项目标书翻译 skills, not this one of the basic starting point of opening up what?We do not care about their wealth, the Americans would really care about. MD90 project has not fully ended, the Americans could not wait to face the Chinese side urged the administration to destroy all documents and drawings, and announced that continued use is illegal.after工程标书翻译 项目建议书翻译 设备标书翻译 政府采购标书翻译 轨道工程标书翻译 铁路建设标书翻译 公路建设标书翻译 桥梁隧道标书翻译 装饰工程标书翻译 房屋建筑标书翻译 石油标书翻译 天然气工程标书翻译 化工工业标书翻译 机电工程标书翻译 建筑标书翻译 years of practice and training "group", because there is no aircraft mission, the threat is on the verge of disintegration. January, a few hundred dollars for living expenses, have been difficult years for me to keep quiet dedication to the cause of national英文标书翻译包括工程建设标书、道路施工标书、国际投标书翻译 machine technicians we do. These people are not facing a general sense of "workers laid off" problem. Many of them are actually "Baby", and even some people get Boeing's qualifications, just go all technical elite. The value of this group is difficult to measure with money. Loss is easy to gather hard, so teams really moved to out of hand, think up to the national英文标书翻译包括工程建设标书、道路施工标书、国际投标书翻译 "large aircraft" tougher nut to crack! In the face of the current international英文标书翻译包括工程建设标书、道路施工标书、国际投标书翻译 environment, who can guarantee this country no longer need to have the ability to manufacture large aircraft, a? Source: "World Aviation 标书制作行业industry Overview" 1988/1989 p984-986Notes:[1] FAA Federal Aviation Administration is abbreviation. Airworthiness issued by the council to prove that the mean achieved international英文标书翻译包括工程建设标书、道路施工标书、国际投标书翻译 sales, operations permits.[2] which is responsible for flying into the nose, boarding doors, service door, boarding ladder, XAC is responsible for the forward fuselage, aft fuselage lower and upper box, tip, inside and outside flaps, wing boxes, SAC is responsible for Endian, power centers, radio frame, the whole machine cable, on the flight is responsible for Hirao, slats, riveted and in the upper body up and down after工程标书翻译 项目建议书翻译 设备标书翻译 政府采购标书翻译 轨道工程标书翻译 铁路建设标书翻译 公路建设标书翻译 桥梁隧道标书翻译 装饰工程标书翻译 房屋建筑标书翻译 石油标书翻译 天然气工程标书翻译 化工工业标书翻译 机电工程标书翻译 建筑标书翻译 the Ministry of docking, the wing assembly, the whole machine docking, test and flight test.[3] "china最大的翻译标书公司或机构是哪家? Aviation News" January 4, 2000 Second Edition.[4] fee just to talk about balance, March 14, 2000, Shanghai.[5] Liu dry unitary talk, ibid.
|