新华翻译社总机:4008281111   客服部地址:南大街6号国务院机关第二招待宾馆(国二招)3号楼B5319室
 
机构概况
国家标准
翻译流程
翻译价格
人才信息
联系我们
 
首页>>>新华翻译社>>>烟台翻译公司

    翻译公司中,大部分是没有聘用全职翻译的中介式机构,近半还是几个人组成的作坊式翻译事务所,少部分甚至没有经过工商合法注册,至于翻译、校对、审核、排版等必须流程,只有不足两成的翻译公司能够完整走完;因而,翻译行情中,与低档翻译质量相应的是低端翻译价格,造成能实现盈利的翻译公司竟然不足一成;结果,往往不到一年,客户发现原来合作的“翻译公司”突然消失了、有的“翻译中心”因为工商年检通不过又改了个名字。鉴于这种现状,为了保障客户利益、规范翻译市场做出我们的贡献,新华翻译社凭借多年培育的良好品牌形象和多年积累的翻译企业运营经验,充分利用互联网科技,要让客户享受到正规翻译公司的优质服务,同时领略到专业化、标准化、规模化翻译服务的风采。
    新华翻译社是中国早期创立连锁营运模式的老牌翻译公司,专业为高端客户提供英语、日语、德语、法语、韩语、俄语、西班牙语、意大利语、葡萄牙语、阿拉伯语等权威翻译服务,特别擅长工程建设翻译、采购标书翻译、规范标准翻译、专利论文翻译、法律证书翻译、石油化工翻译、汽车机电翻译和财经年报翻译。凭借完备的行业翻译解决系统和成熟的翻译项目管理经验,我们将为翻译客户提供专家级翻译服务。
烟台翻译公司专业为高端客户提供英语、日语、德语、法语、韩语、俄语、西班牙语、意大利语、葡萄牙语、阿拉伯语等权威翻译服务。
 
 
 
烟台翻译公司专业项目团队真诚服务烟台市、芝罘区、福山区、牟平区、莱山区、龙口市、莱阳市、莱州市、蓬莱市、招远市、栖霞市、海阳市、长岛县
烟台翻译公司关键字:After joining the WTO, how to improve the competitiveness of China's real estate industry is currently facing important issues. In this case, described how reasonable and effective control of real estate real estate project cost to enhance the competitiveness of our several ways.Keywords Cost Control Real Estate DevelopmentChina's accession to WTO, the real estate industry will face new competition and challenges. Foreign real estate agency will rely on a strong financial capability, high level of technical equipment and management, and flexible management system and other advantages to enter China's market. Most of the domestic real estate developers are very limited liquidity on hand, even if a great amount of liquidity in hand, they are reluctant to be "stuck." Thus, in the face of the new market, savvy developers in addition to learn Riddles, from large-scale, group, etc. to develop their own brand, but still from within the start, through the strengthening of project quality management and supervision, and strict control engineering costs, for the lowest investment, get the best of economic efficiency, thereby improving the competitiveness in the market. The key to controlling project cost is reasonable and effective control of project cost.Real estate developers, how to effectively identify and control the cost of construction of the problem is that every major issue facing the real estate business. In general, identification and control of project cost can be divided into four stages, namely, decision-making phase, design phase, construction phase, completion phase. To determine a reasonable and effective control of project cost, we must start from the four stages.A decision-making phase of cost controlFeasibility of program selection and positioning of the estimated investment by the project's core, this stage is not only related to the length of time to achieve the objective, the quality of the pros and cons, but also the source of the whole process of cost control, cost of the subsequent stages of the control from the guiding role. At this stage how the quality, cost and schedule integration is good, on the need for adequate market research, detailed data collection and repeated the program compared to select the best possible combination, make scientific decisions
烟台翻译公司网站更新:接收到项目后,我们将核对客户的翻译数量和要求,包括页数、字数、排版格式、图片处理方式、文本格式、交稿方式、交稿时间等合同中涉及的相关内容。
烟台翻译公司版权所有